REQ-001..006 -> #778, Status: Planned. Spec (EARS) lives in the issue body;
these rows are the committed traceability anchor. Flipped to Done as tests land.

Refs #778
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 13:10:55 +02:00

4.4 KiB

Requirements Traceability Matrix (RTM)

Living document. One row per REQ-NNN across all in-flight and shipped features. The spec itself lives in the Gitea issue (issue-only — there is no committed spec.md); this matrix is the part of the spec that is committed: it links each requirement to its issue, the code that implements it, and the test(s) that prove it — so any requirement traces end to end, and any orphan (a requirement with no test) is visible on main.

How to update

  1. When a feature's issue is approved (via /review-issue), add one row per REQ-NNN with the Issue set to the Gitea issue number and Status: Planned. Commit these rows on the feature branch (they merge with the feature's PR).
  2. As tasks land, fill Implementation File(s) + Test(s) and flip StatusIn progressDone.
  3. REQ-IDs are scoped per feature, so always read them together with the Issue column — REQ-001 for issue #142 is not REQ-001 for issue #150.
  4. The sdd-gate.yml CI job (rtm-check) warns (non-blocking, for now) when a row is missing its Issue or Test(s). It flips to blocking once adoption settles (see the workflow's TODO).

Status legend

Planned · In progress · Done · Deferred

Matrix

REQ-ID Requirement Summary Issue Feature Implementation File(s) Test(s) Status
REQ-001 Store avatar at avatars/{userId}, overwrite #example profile-picture-upload (_example) UserService (planned) UserServiceAvatarTest#storesUnderUserKey, #replaceLeavesNoOrphan Planned
REQ-002 Upload self avatar → 200 + avatarUrl #example profile-picture-upload (_example) UserAvatarController, UserService (planned) UserAvatarControllerTest#uploadReturnsAvatarUrl Planned
REQ-003 Delete self avatar → avatarUrl null #example profile-picture-upload (_example) UserAvatarController (planned) UserAvatarControllerTest#deleteClearsAvatar Planned
REQ-004 No avatar → null + initials placeholder #example profile-picture-upload (_example) UserProfileView, avatar component (planned) avatar-placeholder.svelte.spec.ts Planned
REQ-005 ADMIN_USER may delete others' avatar #example profile-picture-upload (_example) UserAvatarController (planned) UserAvatarControllerTest#adminDeletesOthersAvatar Planned
REQ-006 Unauthenticated → 401, store nothing #example profile-picture-upload (_example) SecurityConfig, controller (planned) UserAvatarControllerTest#unauthenticatedReturns401 Planned
REQ-007 Non-image → 400 UNSUPPORTED_FILE_TYPE #example profile-picture-upload (_example) UserService (planned) UserAvatarControllerTest#rejectsNonImage Planned
REQ-008 Over 2 MB → 400 AVATAR_TOO_LARGE #example profile-picture-upload (_example) UserService, ErrorCode (planned) UserAvatarControllerTest#rejectsOversize Planned
REQ-009 Non-admin on others → 403 FORBIDDEN #example profile-picture-upload (_example) UserAvatarController (planned) UserAvatarControllerTest#nonAdminForbiddenOnOthers Planned
REQ-001 Render dated entry via shared formatDocumentDate (de/en/es) #778 timeline-date-label frontend/src/lib/timeline/dateLabel.ts (planned) dateLabel.spec.ts DAY/SEASON/RANGE delegation Planned
REQ-002 Non-UNKNOWN + non-empty date → shared label, raw=null, getLocale() #778 timeline-date-label frontend/src/lib/timeline/dateLabel.ts (planned) dateLabel.spec.ts localized DAY de/en Planned
REQ-003 UNKNOWNnull (no chip) #778 timeline-date-label frontend/src/lib/timeline/dateLabel.ts (planned) dateLabel.spec.ts returns null for UNKNOWN Planned
REQ-004 null/undefined/'' eventDate → null, no formatter call #778 timeline-date-label frontend/src/lib/timeline/dateLabel.ts (planned) dateLabel.spec.ts null/empty eventDate Planned
REQ-005 No rendering logic outside documentDate.ts #778 timeline-date-label frontend/src/lib/timeline/dateLabel.ts (façade) inspection + delegation tests Planned
REQ-006 timeline in coverage include (80% branch gate) #778 timeline-date-label frontend/vite.config.ts (planned) npm run test:coverage shows dateLabel.ts Planned